| FLIGHT SCHEDULE |
|---|
| Direct Codeshare Flights: |
| Mon-Wed,Fri-Sun
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A319 (319) 3:00 Valid until 2026-01-14 Codeshare flight, operated by Iberia.(IB 797) |
| Thu
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A320 (320) 3:00 Valid until 2026-01-08 Codeshare flight, operated by Iberia.(IB 797) |
| Daily
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A319 (319) 3:00 Effective 2026-01-15 through 2026-01-28 Codeshare flight, operated by Iberia.(IB 797) |
| Mon-Thu,Sun
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A320 (320) 3:00 Effective 2026-01-29 through 2026-02-05 Codeshare flight, operated by Iberia.(IB 797) |
| Fri,Sat
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A319 (319) 3:00 Effective 2026-01-30 through 2026-01-31 Codeshare flight, operated by Iberia.(IB 797) |
| Daily
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A320 (320) 3:00 Effective 2026-02-06 through 2026-02-13 Codeshare flight, operated by Iberia.(IB 797) |
| Mon,Wed,Sat
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A319 (319) 3:00 Effective 2026-02-14 through 2026-02-21 Codeshare flight, operated by Iberia.(IB 797) |
| Tue,Thu,Fri,Sun
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A320 (320) 3:00 Effective 2026-02-15 through 2026-02-20 Codeshare flight, operated by Iberia.(IB 797) |
| Wed,Sat,Sun
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A319 (319) 3:00 Effective 2026-02-22 through 2026-03-01 Codeshare flight, operated by Iberia.(IB 797) |
| Mon,Tue,Thu,Fri
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A320 (320) 3:00 Effective 2026-02-23 through 2026-02-27 Codeshare flight, operated by Iberia.(IB 797) |
| Daily
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A319 (319) 3:00 Effective 2026-03-02 through 2026-03-24 Codeshare flight, operated by Iberia.(IB 797) |
| Wed,Sun
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A320 (320) 3:00 Effective 2026-03-25 through 2026-03-29 Codeshare flight, operated by Iberia.(IB 797) |
| Thu-Sat
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A319 (319) 3:00 Effective 2026-03-26 through 2026-03-28 Codeshare flight, operated by Iberia.(IB 797) |
| Mon-Wed,Sat
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A319 (319) 3:00 Effective 2026-03-30 through 2026-05-30 Codeshare flight, operated by Iberia.(IB 797) |
| Thu,Fri,Sun
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A320 (320) 3:00 Effective 2026-04-02 through 2026-05-31 Codeshare flight, operated by Iberia.(IB 797) |
| Mon,Thu,Fri,Sun
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A320 (320) 3:00 Effective 2026-06-01 through 2026-06-11 Codeshare flight, operated by Iberia.(IB 797) |
| Tue,Wed,Sat
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A319 (319) 3:00 Effective 2026-06-02 through 2026-06-10 Codeshare flight, operated by Iberia.(IB 797) |
| Tue,Wed,Fri,Sat
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A319 (319) 3:00 Effective 2026-06-12 through 2026-06-17 Codeshare flight, operated by Iberia.(IB 797) |
| Mon,Thu,Fri,Sun
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A320 (320) 3:00 Effective 2026-06-14 through 2026-07-17 Codeshare flight, operated by Iberia.(IB 797) |
| Tue,Wed,Sat
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A319 (319) 3:00 Effective 2026-06-20 through 2026-07-15 Codeshare flight, operated by Iberia.(IB 797) |
| Mon,Thu-Sun
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A320 (320) 3:00 Effective 2026-07-18 through 2026-09-18 Codeshare flight, operated by Iberia.(IB 797) |
| Tue,Wed
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A319 (319) 3:00 Effective 2026-07-21 through 2026-09-16 Codeshare flight, operated by Iberia.(IB 797) |
| Mon-Wed,Sat
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A319 (319) 3:00 Effective 2026-09-19 through 2026-10-24 Codeshare flight, operated by Iberia.(IB 797) |
| Thu,Fri,Sun
19:55
Madrid (MAD) 4
22:55
Vienna (VIE) 3 LA 1635 Non-stop Airbus A320 (320) 3:00 Effective 2026-09-20 through 2026-10-23 Codeshare flight, operated by Iberia.(IB 797) |