All airlines flying from Muscat (MCT) to Peshawar (PEW).

Ad box here 7322741189 I FlightInfo Top Box
Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Sat 10:45 Muscat (MCT) 14:20 Peshawar (PEW)
Pakistan International Airlines PK 260 Non-stop Airbus A320 (320) 2:35
Tue,Sat 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
SalamAir OV 597 Non-stop Airbus A320 (320) 2:35 Valid until 2025-05-03
The flight arrives 1 day after departure.
Tue 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
SalamAir OV 597 Non-stop Airbus A321neo (32Q) 2:35 Operates only on 2025-05-06
The flight arrives 1 day after departure.
Sat 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
SalamAir OV 597 Non-stop Airbus A320neo (32N) 2:35 Operates only on 2025-05-10
The flight arrives 1 day after departure.
Tue,Sat 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
SalamAir OV 597 Non-stop Airbus A320 (320) 2:35 Effective 2025-05-13 through 2025-05-17
The flight arrives 1 day after departure.
Tue 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
SalamAir OV 597 Non-stop Airbus A321neo (32Q) 2:35 Operates only on 2025-05-20
The flight arrives 1 day after departure.
Sat 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
SalamAir OV 597 Non-stop Airbus A320neo (32N) 2:35 Operates only on 2025-05-24
The flight arrives 1 day after departure.
Tue,Sat 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
SalamAir OV 597 Non-stop Airbus A320 (320) 2:35 Effective 2025-05-27 through 2025-05-31
The flight arrives 1 day after departure.
Tue 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
SalamAir OV 597 Non-stop Airbus A321neo (32Q) 2:35 Effective 2025-06-03 through 2025-09-02
The flight arrives 1 day after departure.
Sat 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
SalamAir OV 597 Non-stop Airbus A320neo (32N) 2:35 Effective 2025-06-07 through 2025-06-14
The flight arrives 1 day after departure.
Sat 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
SalamAir OV 597 Non-stop Airbus A321neo (32Q) 2:35 Operates only on 2025-06-21
The flight arrives 1 day after departure.
Sat 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
SalamAir OV 597 Non-stop Airbus A320neo (32N) 2:35 Effective 2025-06-28 through 2025-07-26
The flight arrives 1 day after departure.
Sat 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
SalamAir OV 597 Non-stop Airbus A321neo (32Q) 2:35 Operates only on 2025-08-02
The flight arrives 1 day after departure.
Sat 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
SalamAir OV 597 Non-stop Airbus A320neo (32N) 2:35 Effective 2025-08-09 through 2025-08-30
The flight arrives 1 day after departure.
Tue,Sat 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
SalamAir OV 597 Non-stop Airbus A321neo (32Q) 2:35 Effective from 2025-09-06
The flight arrives 1 day after departure.
Direct Codeshare Flights:
Sat 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
Oman Air WY 5223 Non-stop Airbus A320neo (32N) 2:35 Effective 2025-06-07 through 2025-06-14
Codeshare flight, operated by SalamAir.(OV 597)
The flight arrives 1 day after departure.
Sat 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
Oman Air WY 5223 Non-stop Airbus A320neo (32N) 2:35 Effective 2025-06-28 through 2025-07-26
Codeshare flight, operated by SalamAir.(OV 597)
The flight arrives 1 day after departure.
Sat 23:55 Muscat (MCT) 03:30 Peshawar (PEW)
Oman Air WY 5223 Non-stop Airbus A320neo (32N) 2:35 Effective 2025-08-09 through 2025-08-30
Codeshare flight, operated by SalamAir.(OV 597)
The flight arrives 1 day after departure.
Ad flat here 8924483383 I FlightInfo Lower
Parallax here MCT-PEW


All airlines flying from Muscat (MCT) to Peshawar (PEW).
Ad mobi flat here (320x100px) 9629219771 M FlightInfo Top Flat
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:35, non-stop
Airbus A320 (320)

23:55

03:30(+1)
Valid until 2025-05-03
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:35, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Operates only on 2025-05-06
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:35, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Operates only on 2025-05-10
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:35, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Effective 2025-05-13 through 2025-05-17
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:35, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Operates only on 2025-05-20
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:35, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Operates only on 2025-05-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:35, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Effective 2025-05-27 through 2025-05-31
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:35, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Effective 2025-06-03 through 2025-09-02
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 2:35, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Effective 2025-06-07 through 2025-06-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:35, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Operates only on 2025-06-21
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:35, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Effective 2025-06-28 through 2025-07-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:35, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Operates only on 2025-08-02
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:35, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Effective 2025-08-09 through 2025-08-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:35, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Effective from 2025-09-06
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 2:35, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

Direct Codeshare Flights:

23:55

03:30(+1)
Effective 2025-06-07 through 2025-06-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by SalamAir. (OV 597)
Duration: 2:35, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Effective 2025-06-28 through 2025-07-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by SalamAir. (OV 597)
Duration: 2:35, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

23:55

03:30(+1)
Effective 2025-08-09 through 2025-08-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Codeshare flight, operated by SalamAir. (OV 597)
Duration: 2:35, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.
Ad mobi box here (300x250px) 6815354179 M FlightInfo Bottom Box
Parallax here MCT-PEW
  • An international route departing from Muscat airport, Oman (MCT) and arriving at Peshawar airport, Pakistan (PEW).
  • The flight distance is 1074 miles, or 1728 km.
  • The timezone of the departure airport is UTC+4 , and the timezone of the arrival airport is UTC+5 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time is 2:35.